This solution consists of two TRICEPT machines for drilling the “clips” onto the panel and two robotic machines for drilling the “frames” that will support the floor. These solutions are integrated into an assembly line.
The objective of the project is to locate the “clips” previously installed and bonded with sealant, then drill them for subsequent riveting. Additionally, the project aims to locate the support faces on the “frames” for drilling holes where the floating nuts will be installed.
The challenge is to use artificial vision for locating the edges of the parts and drill within a tolerance of ±0.127 mm between holes.



Increase your productivity and efficiency with our high-tech automation solutions.
Transform your project into reality!
To provide the best experience, we use technologies like cookies to store and/or access device information. Your consent to these technologies will allow us to process data such as your browsing behavior and unique identifiers on this site. If you do not consent or withdraw your consent, this may negatively impact certain features and functionality.